Subcenter with fixed connection

Showing all 6 results

  • Explore

    Sub central FUC125X Spine for site cabins

    The FUC125X Spine worksite electrical substation is specifically designed for…

  • Explore
    Plaanikeskus FUC125

    Sub central with fixed incoming FUC125 Spine

    Sub central with fixed incoming cable for temporary electrification at…

  • Explore

    Subcabinet with fixed input and phase load measurement TSR 63/125A

    Fixed connection 63A floor cabinet with phase meters. Phase meters…

  • Explore

    Distribution center with fixed input and phase load measurement TSR 63/125A ver 2

    63A/125A Distribution center with phase load meters and fixed connection…

  • Explore

    Subcabinet with fixed input and phase load measurement TSR 63/125A ver 4

    Subcabinet 63A with phase load meters and fixed connection. Phase…

  • Explore

    Subcabinet with phase load meters and fixed input TSR 63/125A ver 3

    The 63A subcabinet with fixed input connection and integrated phase…