A center made for the control of construction site lighting, with a weekly clock controlling the sockets (6 pcs.). The lids can be locked with a separate lock.
20 kW
IP44
32 A
400 V
Flat nose pliers are used to fasten flat connectors closed…
Very robust work light for hard use at construction sites.…
The nylon hook is well suited for hanging a lights…
Site lighting control center with weekly clocks for indoor lighting…