Sub central 125A with phase load measurement HUB 125/VM
Product code (SKU): 5000352/VMSub central 125A with phase load measurement HUB 125/VM
The center has phase load meters that monitor the load of each of the three phases. The phase-specific meter measures current and voltage. In addition, the meter acts as an indicator light, which indicates that current is coming to the phase.
Thanks to step-by-step measurement, it is possible to monitor the even distribution of the load between the phases on the construction site, avoid skewed loads and thus prevent unnecessary phase overloads and tripping of fuses.
The center’s stackable form is designed so that the center’s outputs and boxes are protected inside the frame. The center is made of galvanized steel and has a sturdy structure. The center is manufactured in Finland and uses only high-quality European components such as PCE and Schneider. All parts of the center are available as spare parts. Changes can also be made to the center according to the customer’s wishes, e.g. the number and size of the outlets can be modified.

Sub central 125A with phase load measurement HUB 125/VM on the worksite
The distribution board is the site’s outlet point: power for hand tools, lighting and dryers is taken from it. It is placed close to the work so that extension cords stay short.
Boards are added as the site grows. The whole is worth planning in advance so that the supply is sufficient for all of them.
This model is rated 125 A. Size the equipment by the actual simultaneous load – the sum of the nameplate ratings almost always leads to oversizing.
Outputs: 12 x 16A/230V, 2 x 16A, 4 x 32 A, 2 x 63 A. Count the work points before choosing – the number of outputs decides how many machines one board can feed.
Where Sub central 125A with phase load measurement HUB 125/VM is used
Typical sites are construction projects, renovations, industrial maintenance and event power. What they share is that the electrical supply is temporary and the conditions are demanding.
Temporary does not mean lighter requirements. Site equipment is exposed to dust, moisture, moving and mechanical stress in a way that fixed installations never are.
Check the load distribution between phases during use. Uneven distribution overloads one phase while the others run half empty, and the usual symptom is a fuse that keeps tripping.
Sub central 125A with phase load measurement HUB 125/VM – how to choose the right model
The equipment is chosen by rated current and outputs. Start by calculating the simultaneous load and the output types needed, and choose the model on that basis.
Other models of the same type are Temporary power supply subcabinet 250 A, Sub cabinet 160 A, Sub cabinet TAK 125A KS, Sub cabinet TAK 63 A KS, Subcabinet TAK 32A.
Other details that affect the choice: protection class IP44, RCD 4 x 300mA, 2 x 30 mA, weight 41 kg, dimensions 80×30×83 cm. These are worth checking already at the quotation stage.
You can see the full range in the product group, and read about real-time monitoring on the Spine page.
Sub central 125A with phase load measurement HUB 125/VM – practical notes for use
Winter brings requirements of its own. Condensation forms when cold equipment is brought into the warm, and moisture inside the enclosure is a common reason for an RCD tripping with no visible cause.
Mark the equipment with the site details and keep a record of what is fed from where. On a site with several contractors that saves time at every fault-finding.
RCD protection is mandatory for socket outputs on a site. Its operation is tested with the test button at commissioning and at regular intervals afterwards.
Sub central 125A with phase load measurement HUB 125/VM – installation and maintenance
Installation and connection work is carried out by a qualified electrician. The equipment must be made dead before connection work, and the absence of voltage verified by measurement.
Place the equipment on level ground and so that it can be reached freely even when the site fills up with material. Material stacked in front blocks both use and emergency isolation.
Test the RCD with its test button at commissioning and at regular intervals afterwards. The test takes a second and is still almost always forgotten.
The unit weighs 41 kg. Take the weight into account when moving and lifting – damage is most often caused during transport, not in use.
Check the joints and fixings regularly during use. A joint that heats up is a sign of a fault and should be corrected before the fault spreads.
Safety and inspections
Site electrical installations are subject to the same requirements as fixed installations, and some of them are stricter. The equipment has to withstand moving, dust, moisture and mechanical stress for the whole project.
The installation is inspected at commissioning and regularly during use: enclosure, joints, the operation of the protective devices and the fact that live parts cannot be reached.
Damaged equipment is not repaired improvised on site. A cracked enclosure, a burnt terminal or a damaged socket is replaced – on a site a temporary repair almost always becomes permanent.
Document the configuration and any changes made. Up-to-date information on outputs and protection speeds up fault-finding and the next inspection.
Delivery and sizing help
We deliver the equipment together with the cables and the rest of the site power supply in one delivery, so the set is complete when it arrives on site.
Describe the whole site in your request for quotation: supply power, the outputs needed and the estimated length of the project. We size the set on that basis.
Use the product number 5000352/VM when ordering and when asking about spare parts. It identifies this exact model, which matters when the same series comes in several sizes.
We also help with the sizing. If you are unsure about the size or the number of outputs, ask us – equipment sized wrong costs more than equipment chosen right the first time.
Frequently asked questions
What is the rated current of Sub central 125A with phase load measurement HUB 125/VM?
The rated current is 125 A.
What outputs does the product have?
Outputs: 12 x 16A/230V, 2 x 16A, 4 x 32 A, 2 x 63 A.
Does the product have an RCD?
Residual current device (RCD): 4 x 300mA, 2 x 30 mA.
What is the protection class?
Protection class: IP44.
What are the dimensions?
Dimensions: 80×30×83 cm.
How much does the product weigh?
Weight: 41 kg.
What is the product number?
The product number is 5000352/VM. Use it in requests for quotation and spare part enquiries.
Who may install the product?
Installation is carried out by a qualified electrician. The requirements are explained in more detail on the Tukes website.
Request a quotation
Add to the quotation basket and send us your request – we will confirm availability and delivery time. You can see the full range in the product group.
Technical information
| Nominal Current | 125 A |
|---|---|
| Nominal voltage | 400 V |
| RCD | 4 x 300mA, 2 x 30 mA |
| Sockets | 12 x 16A/230V, 2 x 16A, 4 x 32 A, 2 x 63 A |
| Dimensions (W x D x H) | 80 x 30 x 83cm |
| Enclosure class | IP44 |
| Weight | 41 kg |
| Model | HUB 125/VM |
| Approvals | CE |