SPINE ON THE CONSTRUCTION SITE

Drying continues, even while you’re at home.

Site heating, electricity and water are the site manager’s responsibility in the evenings and on weekends too. Spine watches them for you and alerts you immediately if something deviates, so the schedule doesn’t suffer from what no one had time to notice. Spine on the construction site monitors heating, electricity and water around the clock.

Apartment block site · Friday 22:14● Live
Floor 3 · temperature
20.4 °C
Floor 3 · humidity
38 %
Electrical load
41 %
Water · flow
31 l/h
Suspected leak on floor 1, water shut off automatically, alarm sent
Included with every Spine device Automatic 4G, no local network needed Continuous monitoring and proactive alarms MID-approved metering available as an option
✕ The situation without Spine

The construction site’s costly surprises

On site, everything looks fine — until Monday, when you discover drying has stalled, a water leak has continued all weekend, or energy costs have run away. What these situations have in common is that they could have been caught in time. Spine monitors the site continuously and alerts you before a small problem becomes an expensive surprise.

Schedule

Drying determines when flooring can be laid and the project handed over. If drying has stalled over the weekend, it’s only noticed on Monday.

Documentation

Moisture-control reporting is a contractual obligation, but the measurement data is on loose notes and different people’s phones.

Costs

Winter heating and electricity are a major expense, but no one knows which part of the site or which contractor is consuming them.

Water damage

A broken fitting leaks from Friday to Monday. The bill arrives weeks later, the drying cost immediately.

What Spine does on site

Spine on the construction site: in order of priority for the site

On a construction site everything starts with drying and the schedule, which is why heating and conditions come first.

Most important on site

Drying and heating measured, not guessed

Spine Valve regulates heating water flow based on measured room temperature, and wireless sensors show temperature and humidity floor by floor. You see whether a heater is really running and whether conditions are progressing as planned, even when no one is on site.

Benefit: the schedule holds, heating doesn’t need to be left on just in case
Cost allocation

See who on site is consuming electricity

Consumption, cost and CO₂ can be reported for the whole site or a part of it — for example just the site offices or one contractor’s area. Electricity price can be tied to the spot price, so the figure is real, not an estimate.

Benefit: costs can be split by measured consumption, not allocated by guess
Damage prevention

A leak caught in hours, not weeks

The water meter detects an abnormal night-time flow and sends an alarm immediately. An automatic shut-off valve can cut water supply outside working hours, so a weekend pipe burst never gets to soak finished structures.

Benefit: water damage and the extra drying it causes never happen
Automation

Lights and generator take care of themselves

Site lighting on when a shift starts and off automatically when it ends, on a schedule. If the site has a generator, Spine keeps its load at a safe level automatically, even when the site is quiet.

Benefit: no wasted fuel or electricity on an empty site
Handover documentation

Site paperwork doesn’t disappear with the folder

A construction project runs for months or years, and site management changes along the way. The Spine service stores the device’s inspection and testing documents, and manuals and site drawings are logged directly against the device.

  • Moisture-control reporting Temperature and humidity history for the whole construction period, ready as an attachment whenever the client or supervisor asks for it.
  • Commissioning inspections and measurement reports Electrical equipment documents attached to the device, so they’re still findable a year later.
  • Energy and CO₂ reports Consumption and emissions for the whole site or a part of it, ready for environmental certification and ESG reporting.
  • History persists after handover too Data and documents remain available even once the project is already complete.
The Spine app shows a site's devices, temperatures and alarms on a phone.
Commissioning on site

From plan to monitoring within the same day

On a construction site, Spine is rolled out in stages as the project progresses — new devices are added as they’re installed.

1

Plan in the office

Heaters and distribution boards are created in the app and placed on the floor plan by dragging, before going to site.

2

Install and scan the QR code

The installer sees the plan on their phone, connects the device and scans the code. The device pairing happens automatically.

3

Thresholds and recipients

Target temperatures, the leak threshold and alarm recipients are set by work phase, and updated as the phase changes.

4

Monitoring and reports

Spine monitors around the clock. Reports and documents accumulate into handover documentation in the background.

Reference

What construction sites say

Awaiting client approval
“Short quote here: what concrete situation did Spine reveal or prevent on site, e.g. a weekend leak or stalled drying.”
? Name Title
Site manager, construction company
Frequently asked questions

Answers to construction site Spine questions

Does Spine need its own network connection on site?

No. The device has a built-in 4G connection, so no separate network infrastructure is needed, even in difficult terrain.

Can consumption be allocated to a single contractor?

Yes. A report can be scoped to part of a site, for example one contractor’s area or a single distribution board.

Is data kept once the site is complete?

Yes. Measurement data and documents are retained for the whole life of the project, including after handover.

Does Spine work with an existing distribution board?

Yes. Spine is available either integrated into a site distribution board or as a separate Plug & Play device for an existing board.

Next step

Two ways to move forward

Want to talk it through first

Book a free 30-minute consultation

We’ll go through your project’s schedule, drying needs and measurement points, and figure out what setup fits. 30 minutes. No obligations.

Book a time →
You already know what you need

Request a quote

Know your site’s size and the devices you need? Add Spine construction-site products to the quote cart.

Go to products →